TASK Construction Management Inc.

Managing Construction ~ Building Trust


Project Profile : Recreation / Leisure

Trail Aquatic Centre

Trail Aquatic CentreTrail Aquatic Centre

Description

An eight lane, 25 meter ‘flat water’ tank in addition to leisure water, community whirlpool, indoor/outdoor water slide, steam room, multi-purpose rooms and large weight-training centre. Additional features included accommodation of handicap-access installations and the provision of a three meter diving platform. Completed in 9 1/2 months from beginning to end over a difficult winter, it was at least five months ahead of all proposed schedules and has been described as the fastest construction of a public pool in Canadian history.

Project Summary

  • Complete

  • Public

  • Location

    Trail, BC
  • Value

    $5,000,000
  • Date Completed

    1 Sept, 1995
  • Owner

    City of Trail
  • Owner Contact

    Mayor Dieter Bogs
    Tel: 250-364-1262
    Fax: 250-364-0830
  • Consultant

    Cannon Design (formerly Johnston Sport Architecture)
  • Consultant Contact

    Bob Johnston
    Tel: 250-388-0155
    Fax: 250-388-4275


TASK Construction Management Inc.

4405 Canada Way
Burnaby, B.C. Canada
V5G 1J3

Tel 604-433-8275
Fax 604-433-3759
Toll Free 800-845-8275

For more information, please contact us at info@taskcm.com

© 2010 TASK Construction Management Inc. All rights reserved.
All information and images on this website are the property of TASK Construction Management Inc. and may not be duplicated.